A:
The planned Eglinton LRT would run from Kennedy Station in the east and eventually terminate at Pearson International Airport.
- The LRT would connect with GO service, the Scarborough RT, and Bloor-Danforth subway in the east, the Yonge subway at Eglinton Station, and the University-Spadina subway at Eglinton West station. It would also interchange with future proposed routes such as the Don Mills and Jane LRTs.
- The Eglinton LRT would be underground throughout the busiest, centre stretch of the city from approximately Laird Drive to Keele Street, (about 20km) with the rest of the line running in a separated right-of-way.
- The LRT would include 26 stops along the route.
- Phase 1 of the project (Jane to Kennedy) was slated to start in 2011 with the tunnel launch at Black Creek, followed by tunnel boring in 2012 and construction of all stations in 2013. This will be completed by 2020. However, substantial portions of the line would begin opening as soon as 2016.
- Phase 2 (Jane to Pearson Airport) would commence following the completion of phase 1, pending confirmation of funding from the provincial government.